Construction Info

  • Concrete belt foundation, concrete belt + "Colombia" concrete block 240 mm
  • Exterior wall: Fibo5 thickness 200 mm + Insulation EPS 200 mm
  • Concrete floor slabs
  • Inner walls: Gypsum board with metal frame, FIBO on the first floor
  • Roof: Flat roof, SBS roofing material with insulation, OSB panel
  • Facade: partially rendered panels
  • Windows: PVC plastic windows with triple glazing
  • Terraces and Balcony doors: 1st floor – Wooden door with triple glazing parallel sliding door, 1st floor - PVC balcony door
  • Front entrance door: Wooden
  • Interior doors: hollow-core flush doors

Technical systems

  • Heating: Each boiler has its own air-water heat pump NIBE COP 4.6 Boiler - 200 l
  • The air-water heat pump boiler also heats utility water
  • The first and second floors have floor water heating
  • Electricity - 3x 20A, double tariff meter, main electrical panel, wiring is prepared for easy TV connection, protection and fire alarms.
  • Centralized water supply and sewer drainage system
  • Land drainage
  • Internet - Starman
  • Energy grading class - B
  • Ventilation - heat recovery ventilation unit
  • Boxes No 2 and 5 have solar panels